Skip to main content Skip to main navigation Skip to site search

404 - Error

Page not found

Sorry, we can not find the page. Perhaps you entered the URL incorrectly? It is also possible that the page has already been deleted.

Please try one of these options:

  • Go to the homepage.
  • Use the search box at the top right.

If you would like to send an email to our technical team, please use this email address: onlinesupport@gentner.de.

 

Perhaps you are interested in our latest news?

Von links Anne Francken, Kaufmännische Geschäftsführerin BASF InfraService & Solutions Lausitz GmbH, Jürgen Fuchs, Vorsitzender der Geschäftsführung BASF InfraService&Solutions Lausitz GmbH, Nils Aldag, CEO Sunfire, Christian von Olshausen, CTO Sunfire.
Technology

High-Temperature Electrolysis: Sunfire Begins Test Operations in Schwarzheide

-

Sunfire has started the construction of a test facility for its latest generation of high-temperature electrolysers (SOEC) in the Lausitz Industrial Park in Schwarzheide. The Dresden-based company aims to validate the technology under industrial conditions in the long term.

Advertisement

Green Hydrogen: Building Resilience for Europe’s Energy Future

-

Green hydrogen is a key building block for the decarbonization and resilience of the European energy system. At the same time, it strengthens Europe’s strategic independence in an increasingly volatile global energy market. However, building a strong European value chain and ensuring a balanced competitive environment requires clear regulations that govern the market access of subsidized Chinese suppliers, as well as realistic RFNBO criteria.

Aerial view of the Kawasaki plant
H2 Production

Asahi Kasei expands capacity for alkaline water electrolysis in Japan to more than 3 GW

-

For the expansion of its production facilities in Kawasaki, Asahi Kasei receives subsidies from the Prefecture of Kanagawa and the City of Kawasaki. By 2028, an annual capacity of at least 2 GW for cell frames and membranes for alkaline electrolyzers is to be established there. With the existing capacity for chlor-alkali electrolysis plants, the annual total capacity would thus increase to over 3 GW.